Flexible job-shop rescheduling for new job insertion by using discrete Jaya algorithm K Gao, F Yang, MC Zhou, Q Pan, PN Suganthan IEEE transactions on cybernetics 49 (5), 1944-1955, 2018 | 231 | 2018 |
Scheduling of single-arm cluster tools for an atomic layer deposition process with residency time constraints FJ Yang, NQ Wu, Y Qiao, MC Zhou, ZW Li IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (3), 502-516, 2016 | 129 | 2016 |
Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets F Yang, N Wu, Y Qiao, R Su IEEE/CAA Journal of Automatica Sinica 5 (1), 270-280, 2017 | 96 | 2017 |
Wafer sojourn time fluctuation analysis of time-constrained dual-arm cluster tools with wafer revisiting and activity time variation Y Qiao, NQ Wu, FJ Yang, MC Zhou, QH Zhu IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (4), 622-636, 2016 | 74 | 2016 |
Solving Traffic Signal Scheduling Problems in Heterogeneous Traffic Network by Using Meta-Heuristics K Gao, Y Zhang, R Su, F Yang, PN Suganthan, MC Zhou IEEE Transactions on Intelligent Transportation Systems, 2018 | 58 | 2018 |
Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication FJ Yang, NQ Wu, Y Qiao, MC Zhou IEEE Transactions on Semiconductor Manufacturing 27 (2), 192-203, 2014 | 53 | 2014 |
Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing FJ Yang, NQ Wu, Y Qiao, MC Zhou IEEE Transactions on Systems, Man, and Cybernetics: Systems 44 (12), 1598-1610, 2014 | 50 | 2014 |
Decomposition methods for manufacturing system scheduling: A survey F Yang, K Gao, IW Simon, Y Zhu, R Su IEEE/CAA Journal of Automatica Sinica 5 (2), 389-400, 2018 | 37 | 2018 |
Robust scheduling of time-constrained dual-arm cluster tools with wafer revisiting and activity time disturbance Y Qiao, NQ Wu, FJ Yang, MC Zhou, QH Zhu, T Qu IEEE Transactions on Systems, Man, and Cybernetics: Systems 49 (6), 1228-1240, 2017 | 37 | 2017 |
Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules FJ Yang, NQ Wu, Y Qiao, MC Zhou IEEE Transactions on Systems, Man, and Cybernetics: Systems 44 (12), 1584-1597, 2014 | 30 | 2014 |
Modeling and optimal cyclic scheduling of time-constrained single-robot-arm cluster tools via Petri nets and linear programming FJ Yang, NQ Wu, Y Qiao, MC Zhou, R Su, T Qu IEEE Transactions on Systems, Man, and Cybernetics: Systems 50 (3), 871-883, 2017 | 23 | 2017 |
Optimal one-wafer cyclic scheduling of time-constrained hybrid multicluster tools via Petri nets FJ Yang, NQ Wu, Y Qiao, MC Zhou IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (11), 2920-2932, 2016 | 22 | 2016 |
Improved jaya algorithm for flexible job shop rescheduling problem K Gao, F Yang, J Li, H Sang, J Luo IEEE Access 8, 86915-86922, 2020 | 19 | 2020 |
Efficient approach to cyclic scheduling of single-arm cluster tools with chamber cleaning operations and wafer residency time constraint F Yang, N Wu, K Gao, C Zhang, Y Zhu, R Su, Y Qiao IEEE Transactions on Semiconductor Manufacturing 31 (2), 196-205, 2018 | 19 | 2018 |
Efficient approach to scheduling of transient processes for time-constrained single-arm cluster tools with parallel chambers FJ Yang, Y Qiao, KZ Gao, NQ Wu, YT Zhu, IW Simon, R Su IEEE Transactions on Systems, Man, and Cybernetics: Systems 50 (10), 3646-3657, 2018 | 18 | 2018 |
Optimal one-wafer cyclic scheduling of hybrid multirobot cluster tools with tree topology FJ Yang, NQ Wu, Y Qiao, MC Zhou IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (2), 289-298, 2016 | 18 | 2016 |
Wafer residency time analysis for time-constrained single-robot-arm cluster tools with activity time variation F Yang, X Tang, N Wu, C Zhang, L Gao IEEE Transactions on Control Systems Technology 28 (4), 1177-1188, 2019 | 13 | 2019 |
Efficient scheduling approaches to time-constrained single-armed cluster tools with condition-based chamber cleaning operations C Li, F Yang, L Zhen International Journal of production research 60 (11), 3555-3568, 2022 | 10 | 2022 |
Petri net-based efficient determination of optimal schedules for transport-dominant single-arm multi-cluster tools F Yang, N Wu, Y Qiao, M Zhou, R Su, T Qu IEEE Access 6, 355-365, 2017 | 9 | 2017 |
System and method for determining an optimized schedule of a production line N Wu, F Yang, Y Qiao, MC Zhou US Patent 10,101,721, 2018 | 6 | 2018 |