Follow
Ion Verzea
Title
Cited by
Cited by
Year
Contribution to the optimization of strategy of maintenance by lean six sigma
A Youssouf, C Rachid, V Ion
Physics procedia 55, 512-518, 2014
732014
Preserving and improving the safety and health at work: Case of Hamma Bouziane cement plant (Algeria)
C Rachid, V Ion, C Irina, B Mohamed
Safety Science 76, 145-150, 2015
482015
Managementul activităţii de mentenanţă
I Verzea, M Gabriel, D Richet
Editura Polirom, 1999
32*1999
Analysis of risk and the strengthening of the safety technical barriers: application of Skikda (Algeria) oil refining complex
L Ait Ouffroukh, R Chaib, V Ion, L Khochmane
World Journal of Engineering 15 (1), 99-109, 2018
262018
Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA)
MS Hellas, R Chaib, I Verzea
journal of engineering, design and technology 18 (1), 40-54, 2020
202020
A Safe and Sustainable Development in a hygiene and healthy company using decision matrix risk assessment technique: a case study
R Kharzi, R Chaib, I Verzea, A Akni
Journal of Mining and Environment 11 (2), 363-373, 2020
182020
WELL-BEING AT WORK: A LEVER FOR SUSTAINABLE PERFORMANCE IN WORKPLACE
M AMRANI, R CHAIB, A BOUZAOUIT, I VERZEA
Mining Science 27, 89–104, 2020
152020
Map risks in the company: highlight at the top priority risks
MS Aouati, R Chaib, I Cozminca, I Verzea
World Journal of Engineering 14 (6), 550-555, 2017
122017
Promoting a sustainable organizational culture in a company: The National Railway Transport Company
A Abdelatif, C Rachid, A Smain, V Ion
Journal of Rail Transport Planning & Management 5 (1), 23-30, 2015
122015
Failure: a source of progress in maintenance and design
R Chaïb, M Taleb, M Benidir, I Verzea, A Bellaouar
Physics Procedia 55, 185-191, 2014
122014
Quantitative Risk Analysis Detailed Study of Thermal and Overpressure Risks Case Study
MS HELLAS, R CHAIB, I VERZEA
RECENT, 128-136, 2018
112018
Promoting a culture of health and safety at work: safety–a permanent priority
R Chaib, I Verzea, M Benidir, M Taleb
WIT Transactions on Information and Communication Technologies 44, 405-413, 2012
112012
FOR A BETTER CONTROL OF THE AVAILABILITY OF THE INDUSTRIAL EQUIPMENTS
R CHAÏB, A BELLAOUAR, M BÉNIDIR, I VERZEA
RECENT 11 (1(28)), 7-10, 2010
112010
The textile industry production systems performance assessment in the global market changes context. part I: theoretical argumentation
I Verzea, GP Luca, LR Manea, R Chaib
Proceedings 6th International Conference on the Management of Technological …, 2009
92009
Management of Technological Changes
I VERZEA, GP LUCA, LR MANEA, RP LAZARESCU
9*2005
Une nouvelle approche de la maintenance: le seuill de maintenabilite
I Verzea, GP Luca
TMCR 2003 4, 2003
92003
Aspects of cyber-security in higher education institutions
AC Cojocariu, I Verzea, R Chaib
Innovation in Sustainable Management and Entrepreneurship: 2019 …, 2020
72020
Software application for the analysis of the reliability of a textile equipment
A Vilcu, I Verzea, C Vilcu
The International Scientific Conference eLearning and Software for Education …, 2017
72017
Dependability breakeven point mathematical model for production-quality strategy support
A Vilcu, I Verzea, R Chaib
IOP Conference Series: Materials Science and Engineering 145 (2), 022001, 2016
72016
THE APPLICATION OF STATISTICAL CONTROL IN STABILITY STATE EVALUATION OF KNITTING PROCESS
L MANEA, RP LAZARESCU, GP LUCA, I VERZEA
Management of Technological, 71-74, 2005
7*2005
The system can't perform the operation now. Try again later.
Articles 1–20