Follow
Dong-Ho Lee
Dong-Ho Lee
Department of Industrial Engineering, Hanyang University
Verified email at hanyang.ac.kr - Homepage
Title
Cited by
Cited by
Year
Disassembly planning and scheduling: review and further research
DH Lee, JG Kang, P Xirouchakis
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2001
1902001
Heterogeneous fixed fleet vehicle routing considering carbon emission
YJ Kwon, YJ Choi, DH Lee
Transportation Research Part D: Transport and Environment 23, 81-89, 2013
1752013
Disassembly scheduling: literature review and future research directions
HJ Kim, DH Lee, P Xirouchakis
International Journal of Production Research 45 (18-19), 4465-4484, 2007
1462007
A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities
K Yeong-Dae, L Dong-Ho, K Jung-Ug, R Hwan-Kyun
Journal of Manufacturing Systems 17 (2), 107-117, 1998
1251998
Parallel disassembly sequencing with sequence-dependent operation times
JG Kang, DH Lee, P Xirouchakis, JG Persson
CIRP Annals 50 (1), 343-346, 2001
1232001
Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line
HS Choi, JS Kim, DH Lee
Expert systems with Applications 38 (4), 3514-3521, 2011
1222011
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
YS Ma, HB Jun, HW Kim, DH Lee
International journal of production research 49 (23), 7007-7027, 2011
1052011
Disassembly scheduling with capacity constraints
DH Lee, P Xirouchakis, R Zust
CIRP Annals 51 (1), 387-390, 2002
1052002
Disassembly scheduling with multiple product types
HJ Kim, DH Lee, P Xirouchakis, R Züst
CIRP Annals 52 (1), 403-406, 2003
1002003
A tabu search algorithm for unrelated parallel machine scheduling with sequence-and machine-dependent setups: minimizing total tardiness
JH Lee, JM Yu, DH Lee
The International Journal of Advanced Manufacturing Technology 69, 2081-2089, 2013
972013
A two-stage heuristic for disassembly scheduling with assembly product structure
DH Lee, P Xirouchakis
Journal of the Operational Research Society 55 (3), 287-297, 2004
922004
Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
HJ Kim, DH Lee, P Xirouchakis
International Journal of Production Research 44 (1), 195-212, 2006
902006
A branch and bound algorithm for disassembly scheduling with assembly product structure
HJ Kim, DH Lee, P Xirouchakis, OK Kwon
Journal of the Operational Research Society 60, 419-430, 2009
762009
Disassembly scheduling: integer programming models
DH Lee, HJ Kim, G Choi, P Xirouchakis
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2004
722004
A priority scheduling approach for flexible job shops with multiple process plans
HH Doh, JM Yu, JS Kim, DH Lee, SH Nam
International Journal of Production Research 51 (12), 3748-3764, 2013
642013
Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops
HS Choi, DH Lee
Computers & Industrial Engineering 56 (1), 113-120, 2009
642009
A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
HJ Kim, DH Lee, P Xirouchakis
Journal of the Operational Research Society 57, 1231-1240, 2006
632006
Search heuristics for operation sequencing in process planning
DH Lee, D Kiritsis, P Xirouchakis
International journal of production research 39 (16), 3771-3788, 2001
612001
Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
HS Choi, HW Kim, DH Lee, J Yoon, CY Yun, KB Chae
The International Journal of Advanced Manufacturing Technology 42, 963-973, 2009
592009
Disassembly scheduling with parts commonality using petri nets with timestamps
KP Neuendorf, DH Lee, D Kiritsis, P Xirouchakis
Fundamenta Informaticae 47 (3-4), 295-306, 2001
572001
The system can't perform the operation now. Try again later.
Articles 1–20