Urmăriți
Nelson Morales
Nelson Morales
Adresă de e-mail confirmată pe polymtl.ca
Titlu
Citat de
Citat de
Anul
Aggregation heuristic for the open-pit block scheduling problem
E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes
European Journal of Operational Research 249 (3), 1169-1177, 2016
882016
Hardness and approximation of gathering in static radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Perennes
Parallel Processing Letters 16 (02), 165-183, 2006
852006
Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning
N Morales, S Seguel, A Cáceres, E Jélvez, M Alarcón
Minerals 9 (2), 108, 2019
622019
On the complexity of bandwidth allocation in radio networks
R Klasing, N Morales, S Pérennes
Theoretical Computer Science 406 (3), 225-239, 2008
492008
A simulation–optimization framework for short-term underground mine production scheduling
F Manríquez, J Pérez, N Morales
Optimization and Engineering 21, 939-971, 2020
372020
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
E Jélvez, N Morales, P Nancel-Penard, F Cornillier
Omega 94, 102046, 2020
322020
Stochastic open-pit mine production scheduling: A case study of an iron deposit
M Maleki, E Jélvez, X Emery, N Morales
Minerals 10 (7), 585, 2020
292020
Panel caving scheduling under precedence constraints considering mining system
M Smoljanovic, E Rubio, N Morales
35th APCOM Symposium, Wollongong, NSW, Australia, 407-417, 2011
282011
A mathematical model for the scheduling and definition of mining cuts in short-term mine planning
G Nelis, N Morales
Optimization and Engineering 23 (1), 233-257, 2022
232022
A new model for automated pushback selection
E Jélvez, N Morales, H Askari-Nasab
Computers & Operations Research 115, 104456, 2020
212020
Open pit mine planning considering geomechanical fundamentals
A Parra, N Morales, J Vallejos, PMV Nguyen
International Journal of Mining, Reclamation and Environment 32 (4), 221-238, 2018
212018
Optimizing pushback design considering minimum mining width for open pit strategic planning
P Nancel-Penard, N Morales
Engineering Optimization 54 (9), 1494-1508, 2022
182022
Optimizing open-pit block scheduling with exposed ore reserve
J Saavedra-Rosas, E Jeivez, J Amaya, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
172016
A two-stage stochastic model for open pit mine planning under geological uncertainty
E Moreno, X Emery, M Goycoolea, N Morales, G Nelis
Proceedings of the 38th International Symposium on the Application of …, 2017
162017
Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles
F Manríquez, H González, N Morales
Optimization and Engineering 24 (1), 681-707, 2023
152023
Value-optimal design of ramps in open pit mining
P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart
Archives of Mining Sciences, 399-413-399-413, 2019
142019
Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty
E Vargas, N Morales, X Emery
142013
Gathering in specific radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Pérennes
AlgoTel'2006-8èmes Rencontres Francophones sur les Aspects Algorithmiques …, 2006
142006
A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine …
P Nancel-Penard, N Morales, F Cornillier
European Journal of Operational Research 303 (3), 1088-1099, 2022
132022
Comparison of different approaches to strategic open-pit mine planning under geological uncertainty
G Nelis, N Morales, E Widzyk-Capehart
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
132019
Sistemul nu poate realiza operația în acest moment. Încercați din nou mai târziu.
Articole 1–20