Modeling and analysis of manufacturing systems RG Askin, CR Standridge (No Title), 1993 | 1299 | 1993 |
Cell formation in group technology: review, evaluation and directions for future research HM Selim, RG Askin, AJ Vakharia Computers & Industrial Engineering 34 (1), 3-20, 1998 | 611 | 1998 |
Design and analysis of lean production systems RG Askin, JB Goldberg John Wiley & Sons, 2007 | 443 | 2007 |
A cost-based heuristic for group technology configuration RG ASKTN, SP Subramantan International Journal of Production Research 25 (1), 101-113, 1987 | 360 | 1987 |
Scheduling flexible flow lines with sequence-dependent setup times ME Kurz, RG Askin European Journal of Operational Research 159 (1), 66-82, 2004 | 335 | 2004 |
Forming effective worker teams with multi-functional skill requirements EL Fitzpatrick, RG Askin Computers & industrial engineering 48 (3), 593-608, 2005 | 240 | 2005 |
Comparing scheduling rules for flexible flow lines ME Kurz, RG Askin International Journal of Production Economics 85 (3), 371-388, 2003 | 209 | 2003 |
A graph partitioning procedure for machine assignment and cell formation in group technology RG Askin, KS Chiu The International Journal of Production Research 28 (8), 1555-1572, 1990 | 199 | 1990 |
A Hamiltonian path approach to reordering the part-machine matrix for cellular manufacturing RG Askin, SH Cresswell, JB Goldberg, AJ Vakharia THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 29 (6), 1081-1100, 1991 | 195 | 1991 |
Project selection, scheduling and resource allocation with time dependent returns J Chen, RG Askin European Journal of Operational Research 193 (1), 23-34, 2009 | 191 | 2009 |
A parallel station heuristic for the mixed-model production line balancing problem RG Askin, M Zhou International Journal of Production Research 35 (11), 3095-3106, 1997 | 174 | 1997 |
Reliability analysis of electronic devices with multiple competing failure modes involving performance aging degradation W Huang, RG Askin Quality and Reliability Engineering International 19 (3), 241-254, 2003 | 171 | 2003 |
A methodology for designing flexible cellular manufacturing systems RG Askin, HM Selim, AJ Vakharia IIE transactions 29 (7), 599-610, 1997 | 144 | 1997 |
Heuristic scheduling of parallel machines with sequence-dependent set-up times ME Kurz, RG Askin International journal of production research 39 (16), 3747-3769, 2001 | 141 | 2001 |
Forming effective worker teams for cellular manufacturing RG Askin, Y Huang International Journal of Production Research 39 (11), 2431-2451, 2001 | 129 | 2001 |
A procedure for production lot sizing with probabilistic dynamic demand RG Askin Aiie Transactions 13 (2), 132-137, 1981 | 117 | 1981 |
Optimal new product design using quality function deployment with empirical value functions D Dawson, RG Askin Quality and Reliability Engineering International 15 (1), 17-32, 1999 | 116 | 1999 |
Formation of independent flow-line cells based on operation requirements and machine capabilities RG Askin, M Zhou IIE transactions 30 (4), 319-329, 1998 | 108 | 1998 |
A generalized SSI reliability model considering stochastic loading and strength aging degradation W Huang, RG Askin IEEE Transactions on Reliability 53 (1), 77-82, 2004 | 101 | 2004 |
Determining the number of kanbans in multi-item just-in-time systems RG Askin, M George Mitwasi, JB Goldberg IIE transactions 25 (1), 89-98, 1993 | 98 | 1993 |